Update: file_revision visible scope now is joined with parent item and checked for both revision and file visibility
New: Projects now store into their own folder within configured path
Fix: db upgrade script does a one-time re-sort of existing physical data to ensure it can be read in new world
Fix: webdav controller (from Gem) did not flag output as utf-8 with correct header, overloaded in dmsf controller instance to fix
Update: Testsuites updated to support a few more conditions for lock processing